Fairing sucks. Still deciding on a paint job so the boat will probably get put back on the water in undercoat.
The board has gone in much better than expected. I do want to re-finish the foils but will wait till after some on-water testing.
https://www.dropbox.com/s/e3v4my8sogwvnbb/2013-08-14%2015.57.24.jpg
Control system put back together with only alignment mods. It is surprisingly smooth and doesn't bind up anywhere near as much as the previous system. Will fiddle around with this in time.
https://www.dropbox.com/s/m1l3vfoi8ry0ypf/2013-08-14%2017.26.24.jpg
Showing posts with label modifications. Show all posts
Showing posts with label modifications. Show all posts
Thursday, August 15, 2013
Monday, August 5, 2013
Monday, July 29, 2013
Winter Boat Work 2 - The Second Coming
More progress photos of the boat work. The cb case and frames are in and only need to drop the deck back on to have the structural items done. Then it is onto fairing, painting and modifying the control system. Four weeks turkish...
https://www.dropbox.com/sc/artv0ulgprmxij2/4cdogCXOsZ
Explanations
Hard working little vacuum pump. Thanks Nick Flutter.
Cam wear strips of epoxy.
Re-core worked well.
Temporary mould of Depron and packing tape.
Hull laminate in way of cb case.
Fair then laminate with light carbon on outside.
Locating dowels protrude through for accurate placement of cb case. Worked well.
Ledges for deck attachment.
cb case frames of 100gsm double bias each side of 6mm foam. Notice no lightening holes as these will cut through all the diagonal fibres reducing stiffness and strength.
Hull bottom opened with dremel and file. Very happy with the fit.
Frames laminated in.
Explanations
Hard working little vacuum pump. Thanks Nick Flutter.
Cam wear strips of epoxy.
Re-core worked well.
Temporary mould of Depron and packing tape.
Hull laminate in way of cb case.
Fair then laminate with light carbon on outside.
Locating dowels protrude through for accurate placement of cb case. Worked well.
Ledges for deck attachment.
cb case frames of 100gsm double bias each side of 6mm foam. Notice no lightening holes as these will cut through all the diagonal fibres reducing stiffness and strength.
Hull bottom opened with dremel and file. Very happy with the fit.
Frames laminated in.
Saturday, June 22, 2013
Winter Boat Work 1 - One of a Kind
Testing this new blogger app.
Below should be photos of my winter boat work so far.
- Repair side delamination both sides
- Move centreboard case forward
- Stiffen both boards
- Miscellaneous repairs
(edit - looks like the blooger app is a bit simple)